We have two major projects in full swing right now: the master bathroom, and the basement.
Here’s their current status.
Bathroom:
Walls painted- check
window replaced- check
shower plumping installed- check
tile laid- check
install light- check
Still to do:
tile shower-
install baseboards and trim-
install toilet-
re-purpose nightstand-
install sink and faucet-
install mirror-
decorate!
Basement:
patch holes in wood paneling- check
prime- check
prime/paint ceiling- check
paint fireplace- half check
Still to do:
caulk corners-
paint walls-
install crown molding-
tile/grout hearth-
paint trim-
install carpet-
roll around on the carpet!
