Weekday projects


All of the tile in the main floor half bath is now removed. We took out the cabinet in there as well. So as soon as they finish installing the vent, and patching the holes from the electrical work I should be set to texture and paint. I was thrilled to see they had tiled the floor under the cabinet. That way we can install the pedestal sink with out having exposed floor boards.
I also prepped the guest bath for paint: patching holes, and wiping off the wallpaper adhesive. I’ll finish sanding it tonight and hopefully Friday I can paint it.
Our electrician is back. He is as slow as ever, and his promises continue to be in vain, but at least a little is getting done each day.
Our roof repair should be done tomorrow!


Leave a Reply

Your email address will not be published. Required fields are marked *